| SAMPLE | ||||||
| 6 | LEOPARD 1 AND 2 TANK INVENTORIES & VARIANTS WORLD-WIDE | |||||
| Class of Equipment: DEQG Equipment for Ground Forces | ||||||
| Country of Manufacture: Germany | ||||||
| TYPE | NAME | USER | QUANTITIES | QUANTITIES | YEAR | |
| OF | OF | IN | OF | OBSERVATIONS | ||
| EQUIPMENT | EQUIPMENT | COUNTRIES | SERVICE | ORDERED | ORDER | |
| ANTI- | GEPARD 5PFZ-A | GERMANY | 2 | 1968 | 35mm Gun Twin.2 Prototypes Built by OERLIKON/CONTRAVES/SIEMENS/SIGNAAL | |
| AIRCRAFT | /KRAUSS-MAFFEI/PORSCHE 1968 ARMY | |||||
| SELF | GEPARD 5PFZ-B | GERMANY | 4 | 1970 | 35mm Gun Twin.4 Prototypes 1970 ARMY.4 Delivery 1971 | |
| PROPELLED | GEPARD 5PFZ-B1 | GERMANY | 12 | 1973 | 35mm Gun Twin.12 Pre-Production 1/73 ARMY.12 Delivery 6/73 | |
| GEPARD 5PFZ-B2 | BELGIUM | 27 | 1977 | 35mm Gun OERLIKON KDA Twin.27 1977 ARMY | ||
| 28 | 1978 | 28 1978 ARMY.28 Delivery 1980 | ||||
| 1995 | 54-54 Disposed of & for Sale 1995 | |||||
| GERMANY | 147 | 122 | 1973 | 35mm Gun OERLIKON KDA Twin.122 Built by KRAUSS MAFFEI 9/73 ARMY.122 | ||
| Delivery from 1973 to 1976 | ||||||
| 73 | 1975 | 73 Built by KRAUSS MAFFEI 1975 ARMY.73 Delivery from 1975 to 1976 | ||||
| 1989 | 195-6 Upgraded into GEPARD 5PZF-B2L 10/89 ARMY | |||||
| 1990 | 189-50 NEGOCIATION/Transfered to SAUDI ARABIA 9/90 | |||||
| 1993 | Planned 189-189 to be Upgraded into GEPARD 5PFZ-B2L 1993 ARMY.Postponed to | |||||
| 1996.Then to 2000.Cancelled 1993 | ||||||
| 1995 | 147(1st Batch) Overhauled & Upgraded by KRAUSS-MAFFEI for HFAF(Heeres | |||||
| Flugabwehr Aufklärungs-und Führungssystem) Compatibility & Digital Computer | ||||||
| ON ORDER 10/95 ARMY & 191(2nd Batch) OPTION.Postponed to 1996 | ||||||
| 1996 | 147(1st Batch) Overhauled & HFAF Upgraded by KRAUSS-MAFFEI with Digital | |||||
| Computer ON ORDER 7/96 ARMY.147 Delivery from 1998 | ||||||
| 2015 | Planned to be Disposed of from 2015 | |||||
| SAUDI ARABIA | 1990 | 35mm Gun OERLIKON KDA Twin.50 NEGOCIATION 9/90 $64.0m.Maybe to be Taken | ||||
| from GERMAN ARMY Stocks | ||||||
| GEPARD 5PFZ-B2L | GERMANY | 231 | 225 | 1976 | 35mm Gun OERLIKON KDA Twin.225 Built by KRAUSS MAFFEI & fitted with SIEMENS | |
| LRF 1976 ARMY.225 Delivery from 1976 to 1980 | ||||||
| 6 | 1989 | 6 from GEPARD 5PZF-B2 Upgraded by KRAUSS MAFFEI 10/89 ARMY | ||||
| 1991 | ARMY Trials 6 Upgraded Prototypes from 1991 to 1993 | |||||
| 1993 | Planned 189 from GEPARD 5PFZ-B2 to be Upgraded ON ORDER 1993 ARMY.Postponed | |||||
| to 1996.Then to 2000.Cancelled 1993.Delivery from 1994 to 1999 | ||||||
| 1997 | Planned 191(2nd Batch) to be Overhauled & HFAF Upgraded by KRAUSS-MAFFEI | |||||
| ON ORDER 1997 ARMY | ||||||
| 2015 | Planned to be Disposed of from 2015 | |||||
| GEPARD 5PFZ-C | NETHERLANDS | 1 | 1967 | 35mm Gun OERLIKON KDA Twin.R&D Prototype 1967 ARMY.Delivery 1969 | ||
| GEPARD 5PFZ-CA | NETHERLANDS | 5 | 1969 | 35mm Gun OERLIKON KDA Twin.5 Pre-Production 1969 ARMY.5 Delivery from 1971 | ||
| to 1972 | ||||||
| GEPARD 5PFZ-CA1 | NETHERLANDS | 60 | 65 | 1977 | PRTL(CA 1).35mm Gun OERLIKON KDA Twin.65 1977 ARMY.65 Delivery from 1978 | |
| 30 | 1979 | 30 1979 ARMY | ||||
| 1989 | Planned 95 to be Upgraded 1989 $202.0m ARMY.Postponed to 1994.2 only | |||||
| Upgraded as Prototypes 10/89 $67.0m ARMY | ||||||
| 1991 | 2 Upgraded Prototypes ARMY Trials from 1991 to 1993 | |||||
| 1994 | 61 instead of 95 Upgraded by HOLLANDSEE SIGNAAL 4/94 ARMY & 10 OPTIONS | |||||
| .95-61=24 to be Disposed of & for Sale & NEGOCIATIONS with EGYPT/FINLAND/ | ||||||
| THAILAND/UAE 4/94 | ||||||
| 1995 | 60 Overhauled & Upgraded for TICCS(Target Information Command & Control | |||||
| System) Compatibility & Digital Computer ON ORDER 10/95 DFL235.0m ARMY & | ||||||
| 10 OPTIONS.Postponed to 1996 | ||||||
| 1996 | 60 Overhauled & TICCS Upgraded by KRAUSS-MAFFEI with Digital Computer ON | |||||
| ORDER 6/96 ARMY & 10 OPTIONS(Stored).60 Delivery from 1998 | ||||||
| 2015 | Planned to be Disposed of from 2015 | |||||
| LEOPARD 1A3 OTOMATIC | ITALY | 1 | 1 | 1989 | 76mm Gun OTO MELARA 76/62 & OTO MELARA T 76 Turret.Prototype Funded by | |
| OTO MELARA 1989 ARMY | ||||||
| 1990 | ARMY/AF Trials/Evaluation from 10/90 to 1991 | |||||
| ARMOURED | LEOPARD 1A1AVLB BIBER | AUSTRALIA | 5 | 5 | 1976 | 5 1976 ARMY |
| BRIDGE | CANADA | 6 | 6 | 1976 | 6 1976 ARMY.2 Based in GERMANY | |
| LAYER | DENMARK | 8 | 1992 | 12 LEOPARD 1A1A4 Received from GERMAN ARMY Stocks & to be Converted 12/92 | ||
| SELF | ARMY.Unconfirmed | |||||
| PROPELLED | 8 | 1993 | 8 Purchased from NETHERLANDS ARMY Stocks 12/93 ARMY.8 Delivery from 1994 | |||
| to 1995 | ||||||
| GERMANY | 105 | 2 | 1965 | BEAVER.MLC 50.R&D 1 Prototype "A" by KHD/KRAUSS-MAFFEI & 1 Prototype "B" | ||
| by PORSCHE/MAK 1965 ARMY.2 Delivery 1969 | ||||||
| 105 | 1973 | MLC 60.105 with 124 Bridges Built by MAK 1973 ARMY.105 Delivery from 1975 | ||||
| 1992 | 105-10 Transfered to GREECE from ARMY Stocks as CFE Transfer Agreement | |||||
| 6/92.Unconfirmed | ||||||
| GREECE | 8 | 8 | 1983 | 8(Maybe only 1) 1983 ARMY | ||
| 1992 | 10 Received from GERMAN ARMY Stocks as CFE Transfer Agreement 6/92.Unconfirmed | |||||
| ITALY | 64 | 64 | 1974 | License by OTO MELARA.64 1974 ARMY.28 Delivery 1979.36 Delivery from 1980 | ||
| to 1983 | ||||||
| NETHERLANDS | 6 | 14 | 1968 | 14 12/68 ARMY | ||
| 1993 | 14-8 Disposed of & Sold to DENMARK 12/93 | |||||
| NORWAY | 1968 | 6(Maybe 5) 1968 ARMY.Unconfirmed | ||||
| LEOPARD 1A5 AVBL LEGUAN | NORWAY | 9 | 1996 | MLC 70 Carry MAN LEGUAN 26m Bridge.9 from LEOPARD 1A5 Converted by MAN GHH | ||
| ON ORDER 1/96 ARMY | ||||||
| LEOPARD 2 PSB 2 | GERMANY | 1994 | MLC 70.PanzerSchnellBrücke.R&D Studies 6/94 ARMY.Refer to EUROBRIDGE | |||
| ARMOURED | LEOPARD 1A1 ARMOURED EENGINEER | BELGIUM | 6 | 6 | 1967 | 6 1967 ARMY.6 Delivery from 1968 |
| ENGINEER | GERMANY | 1 | 1966 | PIPZ 1/BERGEPANZER 2A1.R&D Prototype by PORSCHE 1966 ARMY.Delivery 1967 | ||
| VEHICLES | 36 | 1968 | 36 Built by MAK 1968 ARMY | |||
| 1987 | -36 Upgraded into LEOPARD AEV 2 1987 | |||||
| ITALY | 40 | 12 | 1970 | 12 Built by MAK 1970 ARMY.12 Delivery from 1974 to 1978+ | ||
| 28 | 1982 | License by OTO MELARA.28 1982 ARMY | ||||
| NETHERLANDS | 14 | 1968 | 14 12/68 ARMY.Unconfirmed | |||
| LEOPARD ARMOURED ENGINEER 2 DACHS | CANADA | 9 | 9 | 1988 | BADGER.9 Built by MAK 1988 DM49.0m ARMY.9 Delivery from 3/90 | |
| GERMANY | 140 | 2 | 1973 | PIPZ 2/BADGER.Dozer Blade.R&D 2 Prototypes by MAK 1973 ARMY | ||
| 1974 | ARMY Trials from 1974 to 1977 | |||||
| 140 | 1987 | 36 Upgraded from LEOPARD 1A1 AEV & 104 Upgraded from LEOPARD 1A1 ARV by | ||||
| MAK & fitted with Excavator Shovel 1987 ARMY.140 Delivery from 1989 to 1990 | ||||||
| ARMOURED | LEOPARD 1A1 BREACHER | NORWAY | 1 | 1995 | Minefield Breaching Vehicle.Remotely Operated by TV.1 ON ORDER 12/95 | |
| MINE | NORSK FOLKEHJELP(Foreign-Aid Organisation) | |||||
| CLEARING | SWEDEN | 1 | 1 | 1994 | Minefield Breaching Vehicle.Remotely Operated by TV.Prototype by BOFORS/ | |
| VEHICLES | DEMINING & with TONSTAD MASKIN(NORWAY) 1994 ARMY.Delivery 10/95 | |||||
| 1995 | Evaluation/Demonstration 11/95 ARMY | |||||
| LEOPARD 2A4 MDS | NETHERLANDS | 18 | 1996 | Minefield Breaching.18 from LEOPARD 2A4 Converted ON ORDER 1/96 $34.5m ARMY. | ||
| 18 Delivery 1999 | ||||||
| TANKS | LEOPARD 1 | BELGIUM | 132 | 334 | 1967 | 105mm Gun L 7A3.334(3rd & 4th Batch) 1967 ARMY.334 Delivery from 1968 |
| 1974 | 324 Upgraded by FWM with CADILLAC GAGE Stabilisation System 1974 ARMY.324 | |||||
| Delivery from 1975. 120 Upgraded with SABCA COLBEDA FCS 1974 ARMY | ||||||
| 1980 | 204 Upgraded with SABCA COLBEDA FCS 1980 ARMY.204 Delivery from 1980 to 1985 | |||||
| 1986 | 1 as Prototype Upgraded with SABCA/OIP GPS/FCS & BLOHM & VOSS Add-on Armour | |||||
| 12/86 ARMY.Delivery 10/88 | ||||||
| 1990 | Planned 86 instead of 128/334 to be Upgraded by SABCA with GPS/FCS from | |||||
| 1990 to 1999 $212.0m(FY88) ARMY.Delayed & Postponed to 1992.5 Pre- | ||||||
| Production Delivery from 6/92 | ||||||
| 1992 | 334-132 Upgraded into LEOPARD 1A5 1992.Postponed | |||||
| 1995 | 334-202 Disposed of=23 Stored & 155 for Sale from 1995.-61 instead of 180 | |||||
| (From the 155) Sold to BRAZIL 3/95 | ||||||
| BRAZIL | 61 | 1995 | 105mm Gun L 7A3.61 instead of 180 Purchased from BELGIUM ARMY Stocks ON | |||
| ORDER 3/95 $10.9m ARMY.61 Delivery from 6/96(Unconfirmed) | ||||||
| 1996 | Planned to be Upgraded to LEOPARD 1A4 Standard ON ORDER 1/96 ARMY | |||||
| FRANCE | 1957 | STANDARD-PANZER Program.R&D Studies in Cooperation with GERMANY as AMX 30 | ||||
| Program 6/57 ARMY | ||||||
| 2 | 1958 | Joined by ITALY 9/58 ARMY.R&D 2 Prototypes 10/58 ARMY | ||||
| GERMANY | 1957 | STANDARD-PANZER Program.90mm Gun.R&D Studies in Cooperation with FRANCE | ||||
| 6/57 ARMY | ||||||
| 4 | 1958 | Joined by ITALY 9/58 ARMY.R&D 4 Prototypes as Team "A"=PORSCHE/MAK/LUTHER | ||||
| & JUNG & Team"B"=RUHRSTALL/RHEINSTAHL-HANOMAG/HENSCHEL 10/89 ARMY.2 Team | ||||||
| "A1" Prototypes Delivery 1/61.2 Team "B1" Prototypes Delivery 9/61 | ||||||
| 27 | 1961 | PORSCHE TYP 773.R&D 27 "A2" Prototypes(AG 1 & AG 2) by WEGMANN & JUNG- | ||||
| JUNGENTHAL 1/61 ARMY.Trials "A1" & "B1" Prototypes ARMY from 11/61 to 4/62 | ||||||
| 50 | 1962 | 105mm Gun L 7A3.50(O Batch) Pre-Serie=16 Built by MAK & 17 Built by LUTHER/ | ||||
| JORDAN & 17 Built by JUNG-JUNGENTHAL 1962 ARMY.50 Delivery from 6/63."A1" | ||||||
| Prototype Winner 4/62.6 "B2" Prototypes 6/62 ARMY.Stopped 9/62.ARMY "A2" | ||||||
| Prototype Trials 10/62 | ||||||
| 1963 | 13(7 for Gunnery & 6 for Locomotive/Driving) Pre-Production Trials from | |||||
| 6/63 ARMY.1500 8/63 ARMY | ||||||
| 500 | 1965 | 500(Maybe only 400)(1st Batch) Built by KRAUSS-MAFFEI 1/65 ARMY.500 | ||||
| Delivery from 9/65 to 7/66 | ||||||
| 600 | 1966 | 600(2nd Batch) Built by KRAUSS-MAFFEI 1/66 ARMY.600 Delivery from 7/66 | ||||
| to 7/67 | ||||||
| 500 | 1967 | 500(3rd Batch) Built by KRAUSS-MAFFEI 1/67 ARMY.500 Delivery from 7/67 | ||||
| to 8/68 | ||||||
| 245 | 1968 | 245(Maybe 345)(4th Batch) Built by KRAUSS-MAFFEI 1/68 ARMY.245 Delivery | ||||
| from 8/68 to 2/70 | ||||||
| 1970 | 1845-1845 Upgraded into LEOPARD 1A1 4/70 | |||||
| Total Required Initial ARMY 1845.Total Production all Versions ARMY 2437. | ||||||
| Total Production all Versions for 10 Countries 4744 | ||||||
| ITALY | 1958 | STANDARD-PANZER Program.R&D Studies in Cooperation with FRANCE & GERMANY | ||||
| 9/58 ARMY | ||||||
| LEOPARD 1A1 | GERMANY | 1845 | 1970 | 105mm L 7A3 Gun.1845 from LEOPARD 1 Upgraded with CADILLAC Turret | ||
| Stabilisation System & Barrel Thermal Sleeve 4/70 ARMY | ||||||
| 1975 | 1845-1845 Upgraded into LEOPARD 1A1A1 1975 | |||||
| LEOPARD 1A1A1 | GERMANY | 1845 | 1975 | 105mm L 7A3 Gun.1845 from LEOPARD 1A1 Upgraded by BLOHM & VOSS with | ||
| Additional Turret Armour 1975 ARMY.1845 Delivery from 1975 to 1977 | ||||||
| 1982 | 1845-1845 Upgraded into LEOPARD 1A1A2 1982 | |||||
| 1988 | LEOPARD 1A1A3 as new Denomination when fitted with SEM 80/90 Digital Radios | |||||
| 1988 ARMY | ||||||
| LEOPARD 1A1A2 | GERMANY | 1845 | 1982 | 105mm L 7A3 Gun.1845 from LEOPARD 1A1A1 Upgraded with AEG PZB 200 NV | ||
| System 1982 ARMY | ||||||
| 1986 | 1845-1225 Upgraded into LEOPARD 1A5 12/86 | |||||
| 1988 | 620-620 Upgraded into LEOPARD 1A1A4 1988 | |||||
| LEOPARD 1A1A4 | GERMANY | 620 | 1988 | 105mm L 7A3 Gun.620 from LEOPARD 1A1A2 Upgraded with SEM 80/90 Radios | ||
| 1988 ARMY | ||||||
| 1992 | 620-2 Converted into LEOPARD 1 ARV 8/92.618-18 Transfered to DENMARK as | |||||
| LEOPARD ARV 12/92.Unconfirmed.600-12 Transfered to DENMARK as LEOPARD AVLB | ||||||
| 12/92.Unconfirmed | ||||||
| 1993 | 588-588 Phased Out from 1993 to 1996 | |||||
| 1994 | 588-100 Planned to be Sold to THAILAND 3/94 | |||||
| THAILAND | 100 | 1994 | 105mm Gun L 7A3.100 from GERMAN ARMY Stocks NEGOCIATIONS to be Purchased | |||
| 3/94 ARMY | ||||||
| LEOPARD 1A2 | GERMANY | 232 | 1972 | 105mm Gun L 7A3.232(5th Batch) Built by KRAUSS-MAFFEI with Cast Steel | ||
| Turret 1972 ARMY.232 Delivery from 1972 to 1974 | ||||||
| 1982 | 232-232 Upgraded into LEOPARD 1A2A1 1982 | |||||
| 1988 | LEOPARD 1A2A2 as new Denomination when fitted with SEM 80/90 Digital | |||||
| Radios 1988 ARMY | ||||||
| LEOPARD 1A2A1 | GERMANY | 232 | 1982 | 105mm L 7A3 Gun.232 from LEOPARD 1A2 Upgraded with AEG PZB 200 NV System | ||
| 1982 ARMY | ||||||
| 1988 | 232-232 Upgraded into LEOPARD 1A2A3 1988 | |||||
| LEOPARD 1A2A3 | GERMANY | 232 | 1988 | 105mm L 7A3 Gun.232 from LEOPARD 1A2A1 Upgraded with SEM 80/90 Radios | ||
| 1988 ARMY | ||||||
| LEOPARD 1A3 | AUSTRALIA | 75 | 53 | 1975 | AS 1.105mm Gun L7A1.53(5th Batch) Built by KRAUSS-MAFFEI with Welded Turret | |
| 5/75 A$49.8m ARMY.53 Delivery 1976 | ||||||
| 34 | 1976 | 34(5th Batch) Built by KRAUSS-MAFFEI with Welded Turret 1976 A$39.7m ARMY | ||||
| 2 | 1977 | 2(5th Batch) Built by KRAUSS-MAFFEI with Welded Turret 1977 A$2.3m ARMY.2 | ||||
| Delivery 1978 | ||||||
| 1979 | 89-13 Stored 1979 | |||||
| Total Required Initial ARMY 89/90 | ||||||
| BOTSWANA | 54 | 1995 | 105mm L 7A3 Gun.54 Purchased from NETHERLAND ARMY Stocks 12/95 ARMY. | |||
| Delivery Stopped as Vetoed by GERMANY 7/96.54 Delivery from 1/96 | ||||||
| BRAZIL | 180 | 1995 | 105mm L 7A3 Gun.180 from NETHERLAND ARMY Stocks Planned to be Purchased | |||
| NEGOCIATIONS 1995 ARMY.Cancelled | ||||||
| CANADA | 114 | 114 | 1978 | C 1.105mm L 7A3 Gun.114=83 Built by KRAUSS-MAFFEI & 31 Built by MAK | ||
| 6/78 ARMY | ||||||
| 1993 | 1 Upgraded with RO(UK) 105mm IWS Gun as Prototype 11/93 ARMY.Could be | |||||
| Disposed of 1993.Axed | ||||||
| 1994 | 114 to be LTLE(LEOPARD Tank Life Extension) Upgraded with Thermal Imaging | |||||
| Sight & Computer Enhancement & new 105mm IWS Gun & Improved Suspension & | ||||||
| Extra Armour ON ORDER 6/94 ARMY.Postponed 12/94 to 1995/96.114 Delivery | ||||||
| from 1996 to 1999 | ||||||
| 1995 | Planned 114(From 1994 ORDER) LTLE Upgraded ON ORDER 1995 $21.7m ARMY. | |||||
| Postponed to 1996.114 Delivery from 1996 to 1999 | ||||||
| 1996 | Planned 114(From 1995 ORDER) LTLE Upgraded ON ORDER 9/96 ARMY | |||||
| DENMARK | 120 | 1974 | 105mm L 7A3 Gun.120 1974 $85.0m ARMY.120 Delivery from 3/76 to 11/78 | |||
| 1991 | 120-120 Upgraded into LEOPARD 1A5 1991 | |||||
| GERMANY | 110 | 1972 | 105mm L 7A3 Gun.110(5th Batch) Built by KRAUSS-MAFFEI with Welded Turret | |||
| 1972 ARMY.110 Delivery from 1972 to 1973 | ||||||
| 1982 | 110-110 Upgraded into LEOPARD 1A3A1 1982 | |||||
| 1988 | LEOPARD 1A3A2 as new Denomination when fitted with SEM 80/90 Digital Radios | |||||
| 1988 ARMY | ||||||
| GREECE | 205 | 106 | 1981 | 105mm L 7A3 Gun.106=73 Built by KRAUSS-MAFFEI & 33 Built by KRUPP/MAK | ||
| DM300.0m ARMY.53 Delivery from 2/83 to 4/84 | ||||||
| 1991 | 170 Received from NETHERLAND ARMY Stocks 8/91 ARMY.Postponed to 7/92 | |||||
| 99 | 1992 | 99(Maybe 109) instead of 172 Received from NETHERLAND ARMY Stocks under CFE | ||||
| Harmonization Plan 11/92 ARMY.Paid by NAMSA(NATO Maintenance & Support | ||||||
| Agency) | ||||||
| ITALY | 720 | 200 | 1970 | 105mm L 7A3 Gun.200 Built by KRAUSS-MAFFEI 1970 ARMY.200 Delivery from 1971 | ||
| to 1972 | ||||||
| 400 | 1974 | License OTO MELARA.400 1974 ARMY.400 Delivery from 1975 to 1978 | ||||
| 120 | 1981 | 120 1981 ARMY.120 Delivery from 1982 to 1983 | ||||
| 1990 | 720 Upgraded with TURMS FCS 1990 L655000.0m ARMY.720 Delivery from 1990 to | |||||
| 1992 | ||||||
| 1994 | 120 Upgraded with new Turret ON ORDER 1994 ARMY.120 Delivery from 7/95 to | |||||
| 1969 to 1972 | ||||||
| 1995 | 720(Maybe 910) in Service at 6/95 ARMY | |||||
| NETHERLANDS | 261 | 415 | 1968 | 105mm L 7A3 Gun.415(Maybe 342/400)(4th Batch) 12/68 ARMY.415 Delivery from | ||
| 1969 to 1972 | ||||||
| 36 | 1969 | 36 1969 ARMY | ||||
| 17 | 1970 | 17 1970 ARMY.17 Delivery 1972 | ||||
| 1989 | Planned 468 to be Upgraded with ZEISS Night Vision/New Fire Control Systems | |||||
| & New Ammo $450.0m from 1989 to 1995.468-2 Updated to LEOPARD 1A5 6/89 | ||||||
| 1991 | The 468 Upgrade Cancelled 2/91 $530.0m Unconfirmed.466-106 Stored 1991. | |||||
| 360-170 Transfered to GREECE 1991.Posponed to 7/92 | ||||||
| 1992 | 360-99 instead of 172 Transfered to GREECE from ARMY Stocks under CFE | |||||
| Harmonization Plan 7/92 | ||||||
| 1995 | Planned 261(Maybe 367)-180(From the Surplus or Storage) to be Sold to BRAZIL | |||||
| 1995.Cancelled.261(Maybe 296) in Service at 6/95 ARMY.201/307-54(From the | ||||||
| Surplus or Storage) Sold to BOTSWANA 12/95.Stand-by at 7/96 | ||||||
| 1996 | -315(Including 54 in Storage) to be Disposed of & for Sale 1996 | |||||
| Total Required Initial ARMY 468 | ||||||
| NORWAY | 78 | 1968 | 105mm L 7A3 Gun.78(4th Batch) 11/68 ARMY.78 Delivery from 6/69 to 1971 | |||
| 1989 | -78 Upgraded to LEOPARD 1A5 1989 | |||||
| TURKEY | 227 | 77 | 1980 | 105mm L 7A3 Gun.77=54 Built by KRAUSS-MAFFEI & 23 Built by KRUPP 1980 ARMY. | ||
| 77 Delivery from 1982 to 1984 | ||||||
| 150 | 1988 | 150 from LEOPARD 1A4 & from GERMAN ARMY Stocks Converted by KRAUSS-MAFFEI | ||||
| 1988 $384.0m ARMY.75 Delivery 8/90.60 Delivery 7/91. | ||||||
| The last 15 are on Hold 11/91 Embargoed | ||||||
| 1991 | 15 Embargoed 11/91 ARMY | |||||
| 1994 | 227 in Service at 1/95 ARMY | |||||
| LEOPARD 1A3A1 | GERMANY | 110 | 1982 | 105mm L 7A3 Gun.110 from LEOPARD 1A3 Upgraded with AEG PZB 200 NV System | ||
| 1982 ARMY | ||||||
| 1988 | 110-110 Upgraded into LEOPARD 1A3A3 1988 | |||||
| LEOPARD 1A3A3 | DENMARK | 100 | 1989 | 100 Purchased from GERMAN ARMY Stocks 1989 $272.0m ARMY | ||
| 1991 | 100-100 Upgraded into LEOPARD 1A5 1991 | |||||
| GERMANY | 110 | 1988 | 105mm L 7A3 Gun.110 from LEOPARD 1A3A1 Upgraded with SEM 80/90 Radios | |||
| 1988 ARMY | ||||||
| 1989 | 110-100 Sold to DENMARK 1989+ | |||||
| 1991 | -92 Transferred to NORWAY 3/91 Unconfirmed | |||||
| LEOPARD 1A4 | DENMARK | 10 | 1989 | 10 Purchased from GERMAN ARMY Stocks 1989 ARMY | ||
| 1991 | 10-10 Upgraded into LEOPARD 1A5 1991 | |||||
| GERMANY | 250 | 1974 | 105mm L 7A3 Gun IFCS.250(6th Batch)=215 Built by KRAUSS-MAFFEI & 35 Built | |||
| by MAK 1974 ARMY.250 Delivery from 1974 to 1975 | ||||||
| 1986 | 250-150 Transfered to TURKEY 1/86.From the 150 15 are on hold at 11/91 | |||||
| Embargoed | ||||||
| 1988 | 100-75 Transferred to GREECE 3/88 | |||||
| 1989 | 25-10 Sold to DENMARK 1989 | |||||
| GREECE | 75 | 75 | 1988 | 105mm L 7A3 Gun.75(Maybe 170) Purchased from GERMAN ARMY Stocks 3/88 | ||
| DM250.0m ARMY.75 Delivery 1989 | ||||||
| TURKEY | 150 | 1986 | 105mm L 7A3 Gun.150 Purchased from GERMAN ARMY Stocks 1/86 $384.0m ARMY | |||
| 1988 | -150 Converted to LEOPARD 1A3 Standard 1988.From the 150 Delivery 15 are | |||||
| on Hold 11/91 | ||||||
| LEOPARD 1A5 | AUSTRALIA | 90 | 1994 | 105mm Gun L 7A3.Planned 90 to be Purchased from GERMAN ARMY Stocks | ||
| NEGOCIATIONS 1994 ARMY | ||||||
| BELGIUM | 1993 | 105mm Gun L 7A3.132 from LEOPARD 1 Upgraded by SABCA(5 Upgraded Monthly | ||||
| from 1993 to 1999) with OIP Sight ON ORDER 1992 $212.0m(FY88) ARMY. | ||||||
| Postponed to 1995/96.132 Delivery from 1992 to 1999 | ||||||
| 132 | 1996 | Planned 132 from LEOPARD 1 Upgraded by SABCA ON ORDER 1996 ARMY | ||||
| DENMARK | 172 | 230 | 1991 | 105mm Gun L 7A3.120 from LEOPARD 1A3 & 100 from LEOPARD 1A3A3 & 10 from | ||
| LEOPARD 1A4 Upgraded with KAE EMES 18 FCS & Dozer Blade & TWMP Mine | ||||||
| Clearing Device 1991 ARMY.230 Delivery from 1992 to 1994 | ||||||
| 1995 | 230=172 in Service & 58 Stored at 6/95 ARMY | |||||
| 30 | 1996 | Planned 30 to be Purchased from GERMAN ARMY Stocks NEGOCIATIONS/ON ORDER | ||||
| 1996 ARMY | ||||||
| GERMANY | 325 | 1225 | 1986 | 105mm Gun L 7A3.1225(Maybe 1339) from LEOPARD 1A1A2 Converted & Upgraded by | ||
| WEGMANN with new FCS & by ZEISS with Thermal Imaging Systems 12/86 ARMY. | ||||||
| 1224 Delivery from 2/87 to 1992.1225-1 Fire Destroyed 12/86 | ||||||
| 1988 | 1 as Prototype fitted with 120mm RHEIMETALL Gun 1988 ARMY.1225-725 Upgraded | |||||
| into LEOPARD 1A5A1 1988 | ||||||
| 1990 | 500-15 Transfered to TURKEY from ARMY Stocks under CFE Harmonization Plan | |||||
| nov.90 | ||||||
| 1991 | 485-90 Transfered to NORWAY 1991 Unconfirmed | |||||
| 1992 | 485-75 Transfered to GREECE from ARMY Stocks under CFE Harmonization Plan | |||||
| juil.92 | ||||||
| 1993 | 410-85 Transfered to TURKEY from ARMY Stocks under CFE Harmonization Plan | |||||
| 7/93.325-325 to be Phased Out from 1993 to 1996 | ||||||
| 1994 | Planned 340-90 to be Transfered to AUSTRALIA from ARMY Stocks as Phased Out | |||||
| 1994 | ||||||
| 1996 | Planned 250-30 to be Transfered to DENMARK from ARMY Stocks 1996 | |||||
| Total Required Initial ARMY 1339.Reduced to 1225(Maybe 1258) FY91 | ||||||
| GREECE | 75 | 75 | 1992 | 105mm Gun L 7A3.75 Received from GERMAN ARMY Stocks under CFE Harmonization | ||
| Plan & Delivery by KRAUSS-MAFFEI 6/92 ARMY | ||||||
| NETHERLANDS | 2 | 2 | 1989 | 105mm Gun L 7A3.2 from LEOPARD 1A3 Upgraded as Prototypes by KRAUSS & WEGMANN | ||
| 6/89 DFE18.0m ARMY.2 Delivery 4/91 | ||||||
| NORWAY | 159 | 78 | 1989 | 105mm Gun L 7A3.78 from LEOPARD 1A3 Upgraded by KRAUSS MAFFEI with EMES 18 | ||
| FCS 1989 ARMY.78 Delivery from 1991 to 1993 | ||||||
| 92 | 1991 | 92 LEOPARD 1A3 Received from GERMAN ARMY Stocks 8/91 ARMY. | ||||
| Planned 92 to be Upgraded to LEOPARD 1A5 Standard 10/91 $76.5m ARMY. | ||||||
| Posponed to 1992.92 Delivery from 1992 to 1993 | ||||||
| 1992 | 26 from LEOPARD 1A3 Upgraded to LEOPARD 1A5 Standard 10/92 ARMY.(Unconfirmed. | |||||
| Maybe Postponed to 1994).26 Delivery from 1992 to 1995 | ||||||
| 1994 | Planned 66/92 from LEOPARD 1A3 to be Upgraded FY94 $133.1m ARMY+ | |||||
| 1996 | 168-9 Converted into LEOPARD 1A5 AVBL 1/96 | |||||
| TURKEY | 100 | 15 | 1990 | 105mm Gun L 7A3.15 Received from GERMAN ARMY Stocks as per CFE Equipment | ||
| Transfer(CASCADE) Program 11/90 ARMY.15 Delivery from 7/92 to 11/93 | ||||||
| 85 | 1993 | 85 Received from GERMAN ARMY Stocks as per CFE Equipment Transfer(CASCADE) | ||||
| Program 7/93 ARMY.85 Delivery from 11/94 to 11/95 | ||||||
| 1995 | 100(Maybe 170) in Service at 6/95 ARMY | |||||
| Total Required Initial ARMY 110 from GERMAN ARMY Stocks as per CFE Equipment | ||||||
| Transfer(CASCADE) Program | ||||||
| LEOPARD 1A5A1 | GERMANY | 405 | 725 | 1988 | 105mm L 7A3 Gun.725 from LEOPARD 1A5 Upgraded with SEM 80/90 Radios 1988 | |
| ARMY | ||||||
| 1995 | 405 in Service 1995 ARMY | |||||
| LEOPARD 2 | GERMANY | 380 | 1977 | 120mm Gun.380(1st Batch) 1977 ARMY.380 Delivery from 1/79 to 1982 | ||
| LEOPARD 2A1 | GERMANY | 450 | 1982 | 120mm Gun.450(2nd Batch) 1982 ARMY.450 Delivery from 1982 to 1983 | ||
| 300 | 1983 | 300(3rd Batch) 1983 ARMY.300 Delivery from 1983 to 1984 | ||||
| LEOPARD 2A3 | GERMANY | 300 | 1984 | 120mm Gun.300(4th Batch) 1984 ARMY.300 Delivery from 1984 to 1985 | ||
| LEOPARD 2A4 | AUSTRIA | 115 | 1995 | 120mm Gun.Planned 115 to be Purchased from NETHERLAND ARMY Stocks | ||
| NEGOCIATIONS/ON ORDER 9/95 $190.0m ARMY | ||||||
| DENMARK | 50 | 1996 | 120mm Gun.Planned 50 to be Purchased from GERMAN ARMY Stocks ON ORDER 1996 | |||
| ARMY | ||||||
| GERMANY | 1373 | 370 | 1985 | 120mm Gun.370(5th Batch) 1985 ARMY.370 Delivery from 1985 to 1987.Total | ||
| all Versions=1800/1964(990 Manufactured by KRAUSS-MAFFEI & 810 Manufactured | ||||||
| by KRUPP) 1977 ARMY.1800/1964 Delivery from 1979 to 1992 | ||||||
| 1993 | 1825/1964-1825/1964 Upgraded into LEOPARD 2A5 IMPROVED.Reduced to 699. | |||||
| Reduced to only 1825/1964-225 12/93 | ||||||
| 1994 | 1600-13 Upgraded into LEOPARD 2A7 1/94.1587-160 instead of 40 Sold to | |||||
| SWEDEN 3/94 & 40 OPTIONS | ||||||
| 1995 | 1427-54 from ARMY Stocks Leased to SPAIN 1995 | |||||
| 1998 | Planned 1269-125 to be Upgraded into LEOPARD 2A5 IMPROVED 1998 | |||||
| 1996 | 1373-54 from ARMY Stocks Leased to SPAIN 1996.Planned 1319-50 to be | |||||
| Transfered to DENMARK from ARMY Stocks 1996 | ||||||
| Total Required all Versions Initial ARMY 2125.Reduced to only 2100(1825/1964) | ||||||
| NETHERLANDS | 150 | 445 | 1982 | 120mm Gun.445 9/82 $1200.0m ARMY.46 Delivery 12/82.120 Delivery 1983.120 | ||
| Delivery 1984.120 Delivery 1985.39 Delivery 1986 | ||||||
| 1994 | 445-180 instead of 330 Upgraded into LEOPARD 2 IMPROVED Standard 3/94. | |||||
| 265-115 Phased Out & Sold to SWEDEN 5/94.Sale Off 2/94 | ||||||
| 1995 | Planned 115(From the 265 Phased Out) to be Sold to AUSTRIA 9/95 | |||||
| 1996 | 115-18 Converted into LEOPARD 2A4 MDS 1/96.97-97(From the 115) for Sale at | |||||
| 1/96 ARMY | ||||||
| SPAIN | 26 | 0 | 1994 | 120mm Gun.License from KRAUSS-MAFFEI by SANTA BARBARA.282 ON ORDER 10/94 | ||
| $784.9m ARMY(Total 390=282+108 instead of Total 534).Postponed to 1998.282 | ||||||
| Delivery from 1998 | ||||||
| 54 | 1995 | 54 Leased for 5 Years from GERMAN ARMY Stocks instead of being Purchased & | ||||
| Overhauled by KRAUSS-MAFFEI ON ORDER 1995 $6.6m(Yearly Lease Cost) ARMY.13 | ||||||
| Delivery 11/95.13 Delivery 12/95.14 Delivery 1/95 | ||||||
| 54 | 1996 | 54 Leased for 5 Years from GERMAN ARMY Stocks instead of being Purchased & | ||||
| Overhauled by KRAUSS-MAFFEI 1996 ARMY.54 Delivery until 6/96 | ||||||
| 1998 | Planned 200 instead of 282 ON ORDER 1998 ARMY.Cancelled Replaced by | |||||
| LEOPARD 2 IMP 6/95.200 Delivery until 2003 | ||||||
| SWEDEN | 160 | 160 | 1994 | STRV 121.120mm Gun.115 from NETHERLANDS ARMY Stocks & 40(with 40 OPTIONS) | ||
| from GERMAN ARMY Stocks to be Purchased 5/94 ARMY.Axed 2/94. | ||||||
| Replaced by 160(Maybe 180) Leased for 15 Years from GERMAN ARMY Stocks 2/94 | ||||||
| ARMY & 40 OPTIONS.160 Delivery from 12/94 to | ||||||
| SWITZERLAND | 380 | 380 | 1983 | PZ 87.120mm Gun.License.380(35 from KRAUSS-MAFFEI & 345 Built by FM | ||
| (SWITZERLAND) 9/83 SF3365.0m ARMY.35 Delivery by KRAUSS-MAFFEI 1987.175 | ||||||
| Delivery from 1988 to 1990.170 Delivery from 1990 to 3/93+ | ||||||
| 2000 | Planned to be Upgraded from 2000 ARMY | |||||
| LEOPARD 2A5 | GERMANY | 1986 | 150(6th Batch) 1/86 ARMY.Cancelled.100 Delivery 1988.42 Delivery 1989. | |||
| 8 Delivery 1990 | ||||||
| 1988 | 75(Batch 7) 1988 ARMY.Cancelled | |||||
| LEOPARD 2A5/7 IMPROVED | GERMANY | 20 | 1 | 1986 | Ex-LEOPARD 2A7.120mm Gun.Prototype by KRAUSS-MAFFEI in Cooperation with | |
| SWITZERLAND/NETHERLANDS 1986 ARMY.*UK Trials.Delivery 9/90 | ||||||
| 2 | 1990 | 2 Prototypes(TVM 1/TVM 2) 1990 ARMY.2 Delivery 12/92 | ||||
| 225 | 1993 | TVM
2 Choosen 3/93 ARMY. 225(Batches 1 to 4) from LEOPARD 2A4 TVM 2 Model |
||||
| Upgraded by KRAUSS-MAFFEI(55%) & MAK(45%)=212 Operational & 13 for Training | ||||||
| School ON ORDER 12/93 $202.0m/DM285.0m/DM363.0m ARMY.7 Delivery from 8/95 | ||||||
| to 12/95.218 Delivery from 1/96 | ||||||
| 125 | 1998 | Planned 125 from LEOPARD 2A4 TVM 2 Model Upgraded by KRAUSS-MAFFEI(55%) & | ||||
| MAK(45%) ON ORDER 1998/99 ARMY | ||||||
| Total Upgraded from LEOPARD 2 2125.Reduced to 699(120 Yearly).Reduced to | ||||||
| only 225 | ||||||
| NETHERLANDS | 180 | 1994 | 120mm Gun.180(Batch 1) from LEOPARD 2A4 TVM 2 Mod Upgraded by KRAUSS-MAFFEI | |||
| with new FCS ON ORDER 3/94 $312.4m ARMY & 150 OPTIONS $179.8m.180 Delivery | ||||||
| from 7/96 | ||||||
| SPAIN | 200 | 1995 | License by SANTA BARBARA for Co-Production from KRAUSS-MAFFEI.200 ON ORDER | |||
| 6/95 ARMY.200 Delivery from 1998 to 2002(40 Yearly) | ||||||
| Total Required Initial ARMY 400 | ||||||
| SWEDEN | 120 | 1994 | STRV 122/LEOPARD 2S.120mm Gun.120=29 Built by KRAUSS-MAFFEI & 91 Assembly | |||
| by HAGGLUNDS with Training & Spares ON ORDER 6/94 $1700.0m ARMY & 90 OPTIONS. | ||||||
| 29 Delivery Directly from GERMANY from 11/96.91 Delivery until 1999 | ||||||
| LEOPARD 2A6 | GERMANY | 1989 | 75(Batch 8)(Maybe only 65) 8/89(34 MAK & 41(Maybe 65) KRAUSS-MAFFEI) $200.0m | |||
| ARMY.Cancelled.41 from KRAUSS-MAFFEI Delivery 4/92 | ||||||
| LEOPARD 2 AUSTERE VERSION | GERMANY | 1 | 1976 | 105mm Gun.Austere Version.R&D Prototype 1976 ARMY | ||
| USA | 1976 | 105mm Gun.Austere Version.Evaluation vs M 1 ABRAMS 9/76 ARMY | ||||
| LEOPARD 3 | GERMANY | 1994 | 140mm Gun & 2 Man Turret.R&D as Leopard 2A7 Stage 3 Upgraded with STN ATLAS | |||
| IFIS 1994 ARMY | ||||||
| ARMOURED | LEOPARD 1A1A1 DRIVER TRAINER | AUSTRALIA | 12 | 12 | 1967 | Driver Trainer.12 1967 ARMY.12 Delivery from 1968 |
| TRACKED | BELGIUM | 60 | 60 | 1978 | Driver Trainer.60 Built by KRAUSS-MAFFEI 1978 ARMY.60 Delivery from 1978 | |
| VEHICLES | to 1979 | |||||
| GREECE | 2 | 2 | 1992 | Driver Trainer.2 Received from NETHERLAND ARMY Stocks 1992 ARMY | ||
| NETHERLANDS | 10 | 12 | 1968 | Driver Trainer.12 12/68 ARMY | ||
| 1992 | 12-2 Transfered to GREECE 1992 | |||||
| LEOPARD 2 DRIVER TRAINER | GERMANY | 22 | 22 | 1986 | Driver Trainer.22 Built by KRAUSS-MAFFEI 1986 ARMY | |
| NETHERLANDS | 20 | 20 | 1986 | Driver Trainer. 20 1986 ARMY | ||
| LEOPARD 2 DRIVER TRAINER | SWITZERLAND | 3 | 3 | 1987 | Driver Trainer. 3(Maybe only 2) 9/87 SF10.0m ARMY | |
| ARMOURED | LEOPARD 1A1 ARMOURED RECOVERY | AUSTRALIA | 8 | 8 | 1976 | 8(Maybe only 6) 11/76 $7.8m(With Bridge) ARMY |
| RECOVERY | BELGIUM | 36 | 36 | 1967 | 36 1967 ARMY.36 Delivery from 1968 | |
| VEHICLES | CANADA | 8 | 8 | 1976 | TAURUS.8 1976 ARMY.5 Based in GERMANY | |
| DENMARK | 1992 | 18 LEOPARD 1A1A4 Received from GERMAN ARMY Stocks & to be Converted 12/92 | ||||
| ARMY.Unconfirmed | ||||||
| 1993 | 14 Purchased from NETHERLANDS ARMY Stocks 12/93 ARMY.Unconfirmed.14 Delivery | |||||
| from 1994 to 1995 | ||||||
| GERMANY | 340 | 2 | 1964 | BERGEPANZER 2.Dozer Blade.R&D 2 Prototypes by JUNG-JUNGENTHAL 1964 ARMY | ||
| 444 | 1966 | 444 Built by MAK 1966 ARMY.444 Delivery from 9/66 to 1968 | ||||
| 1983 | 100 PIP Upgraded 10/83 ARMY | |||||
| 1987 | 444-104 Upgraded into LEOPARD AEV 2 1987 | |||||
| 1991 | 340-6 Transfered to NORWAY 10/91.Unconfirmed | |||||
| 2 | 1992 | 340-25 Transfered to GREECE from ARMY Stocks as CFE Agreement 6/92. | ||||
| Unconfirmed.2 Converted from LEOPARD 1A1A4 by JUNG-JUNGTHAL Prototypes | ||||||
| 8/92 ARMY | ||||||
| Total Production 700 | ||||||
| GREECE | 4 | 4 | 1981 | 4 1981 ARMY.2 Delivery 1983.2 Delivery 1984 | ||
| 1984 | 4 1984 ARMY Unconfirmed | |||||
| 1992 | 25 Received from GERMAN ARMY Stocks as CFE Agreement 6/92 ARMY.Unconfirmed | |||||
| ITALY | 135 | 69 | 1971 | 69 Built by MAK 1971 ARMY | ||
| 68 | 1974 | License by OTO MELARA.68 1974 ARMY.68 Delivery from 1978 to 1982 | ||||
| NETHERLANDS | 35 | 41 | 1968 | 41 12/68 ARMY | ||
| 11 | 1970 | 11 1970 ARMY | ||||
| 1993 | 52-17(14 Sold to DENMARK.Unconfirmed) Disposed of & for Sale from 12/93 | |||||
| NORWAY | 4 | 4 | 1968 | 4(Maybe 6) Built by MAK 1968 ARMY | ||
| 1991 | 6 Received from GERMAN ARMY Stocks 10/91 CFE Treaty.Unconfirmed | |||||
| TURKEY | 12 | 4 | 1980 | 4 Built by MAK 1980 ARMY.4 Delivery from 1982 to 1983 | ||
| 8 | 1988 | 8=4 Built by MAK & 4 Built by KRUPP 1988 ARMY | ||||
| LEOPARD 1A2 ARMOURED RECOVERY | GERMANY | 100 | 100 | 1977 | BERGEPANZER 2A2.Dozer Blade.100 Built by MAK 1977 ARMY.100 Delivery from 1978 | |
| LEOPARD ARMOURED RECOVERY 3 BUFFEL | FRANCE | 1 | 1992 | 1 Evaluation/Trials 6/92 vs CHALLENGER ARRV ARMY | ||
| GERMANY | 78 | 1977 | BUFFALO.With Dozer Blade.R&D from 1977 to 1982 ARMY | |||
| 3 | 1986 | 3 Prototypes 1986 ARMY.Trials from 1988 to 1989 | ||||
| 75 | 1990 | 75(55 Manufactured by KRUPP MAK & 45 Manufactured by KRAUSS-MAFFEI) ON | ||||
| ORDER 6/90(75 for GERMANY & 25 for NETHERLANDS) $144.0m ARMY.45 Delivery by | ||||||
| KRAUSS-MAFFEI 12/92 | ||||||
| 1993 | 75(2nd Batch) ON ORDER 1993 ARMY.Cancelled 10/93 | |||||
| Total Required Initial ARMY 150 | ||||||
| NETHERLANDS | 25 | 25 | 1990 | 25 6/90 DFL171.0m ARMY.25 Delivery from 1/92 | ||
| Total Required Initial ARMY 25 | ||||||
| SWITZERLAND | 1990 | Some ON ORDER 1990 ARMY.Unconfirmed | ||||